1- Civil Works Handling Activities:

a) Site Preparation:
  • Survey , top graphic
  • Soil Investigation
  • Leveling, grading, backfilling, ditching, ROW, Security fence, access road.
b) Concrete Pre-casting:
  • Concrete T-Wall , concrete type grade C25
  • Concrete Piles , square shape. Concrete type grade C45
  • Pedestal , Pipe sleepers , Shelters, Watching tower, Manholes, culvert & duct bank . Concrete type C25-35.
c) Concrete site construction:
  • Tanks Foundation
  • Steel Structure Foundation
  • Vessels Pedestal Foundation
  • Electrical & Instrument Cable Trench
  • Oil & Electrical Equipment’s Foundation.
  • Concrete Padding and Road Pavement
  • OHTL Foundations
  • River Shoulder Concrete Paving.
  • Bridge and Bridge Profile
  • Well Cellar and anchor Blocks
  • Treatment Concrete Tanks
d) Buildings:
  • Multi Story Structure Building
  • Steel Structure Building
  • Warehouse Steel & Structure
  • Living and Office Steel Structure Building
e) Road Paving:
  • Asphalt Road Paving
  • Concrete Road Paving
  • Stone Road Paving.
  • Landscaping, walkways
  • Steel and Structure Bridge

2- DaCo’s Civil Capability:

a) Manpower :

b) Facility & Equipment's :